Consultancy & Permissions

National Highway Access Permissions

Statutory consultancy, technical drawings, feasibility reports, and complete documentation for NHAI / National Highway Access and NOC permissions.

National Highway Access Permissions

Overview & Approach

Complete statutory consultancy, technical engineering drawings, feasibility study reports, and liaison support for National Highway (NHAI / MoRTH / PWD) Access Permissions and NOC approvals.

We assist commercial establishments, fuel stations, logistics parks, industries, resorts, and private properties abutting National and State Highways in obtaining lawful access clearances in strict compliance with MoRTH and IRC statutory guidelines.

Key Capabilities

✓ MoRTH & IRC Norms Compliance Assessment
✓ Preparation of Access Drawing & Geometric Layout Plans
✓ Deceleration & Acceleration Lane Design
✓ Drainage, Culvert & Traffic Circulation Plans
✓ Liaison & Technical Presentation with NHAI / MoRTH Authorities

Our Delivery Process

01

Site Survey & Feasibility Study

Conducting topographic survey, chainage calculation, intersection distance check, and statutory setback verification per MoRTH guidelines.

02

Engineering Drawings & Detailed Report

Drafting accurate layout plans showing acceleration/deceleration lanes, service roads, median openings, and signage details.

03

Documentation & Online Submission

Compiling ownership records, land clearance certificates, bank guarantees, and submitting the formal proposal via the NHAI/MoRTH portal.

04

Inspection & Final Permission

Coordinating site joint inspection with field officers, addressing observations, and securing the final Access Permission / License Deed.

Frequently Asked Questions

Any commercial property, fuel station, warehouse, private layout, hospital, or factory whose entrance or exit connects directly to a National Highway requires formal MoRTH/NHAI access permission.
Key requirements include title documents, revenue map, key plan, detailed engineering drawing following IRC codes, license fee payment, and bank guarantee for construction of entry/exit lanes.
The complete process generally takes 4 to 8 weeks depending on the submission review, joint site inspection, and fulfillment of statutory requirements.